Powered by MOMENTUM MEDIA
world of aviation logo

Defence confirms Block 3i Final upgrade for RAAF F-35As

written by WOFA | January 5, 2017
An Australian F-35A Joint Strike Fighter (A35-002) at Luke Air Force Base, Arizona (USA) with its weapons bay open during the loading of the 500lb Paveway II Laser Guided Bomb, the GBU-12, prior to the aircraft's first ever weapons release. The weapons release took place over the Barry M Goldwater Range just west of Luke Air Force Base, Arizona on (insert date) with Australian pilot Squadron Leader Andrew Jackson flying the sortie.   A35-002 is one of two Australian F-35A aircraft operating out of the F-35 International Pilot Centre at Luke Air Force Base, Arizona.    The Weapons Release marks another significant progress milestone in the Australian F-35A Program.
A35-002 at Luke Air Force Base prior to the weapons release in December. (Lockheed Martin via Defence)

The Royal Australian Air Force’s first two Lockheed Martin F-35A Lightning II Joint Strike Fighters have been upgraded with the final iteration of the aircraft’s Block 3i interim software release, the Department of Defence has confirmed.

“The two Australian F-35A have been loaded with the final release of Block 3i (3iP6) during September 2016,” a Defence spokesperson told Australian Aviation via emailed statement on January 4. 

“Among other capabilities, the 3iP6 software enabled the aircraft to conduct its first weapons release.”

That first weapons release was conducted in December when F-35A A35-002 released a 500lb GBU-12 laser-guided bomb from its starboard side internal weapons bay over the Barry M Goldwater range in southwest Arizona.

A35-002 is one of the first two RAAF F-35As that are currently based at Luke Air Force Base, west of Phoenix. The aircraft were built with an earlier Block 3i software load which restricted them to an interim training and warfighting capability.

The next block of software is Block 3F, and is the final release of software under the System Development and Demonstration phase, which is scheduled to be completed by the end of 2017,” the Defence spokesperson said.

close

Each day, our subscribers are more informed with the right information.

SIGN UP to the Australian Aviation magazine for high-quality news and features for just $99.95 per year