Powered by MOMENTUM MEDIA
world of aviation logo

Boeing rolls out 10,000th 737

written by WOFA | March 13, 2018
Boeing employees point to a special 10,000 Deliveries logo on the fuselage. (Boeing/Twitter)
Boeing employees point to a special “10,000 Deliveries” logo on the fuselage. (Boeing/Twitter)
Boeing’s evergreen 737 program has reached a significant milestone with the 10,000th aircraft recently rolling off the production line.


The milestone was also celebrated by Spirit AeroSystems, whose Kansas plant has built the 737 fuselage since 1966.

The 737 fuselage has been made by Spirit AeroSystems in Wichita since 1966. (Spirit AeroSystems/Twitter)
The 10,000th 737 fuselage being prepared for delivery to Boeing at Spirit AeroSystems Wichita, Kansas, facility. (Spirit AeroSystems/Twitter)

VIDEO: Spirit AeroSystems looks back at the generations of families who have worked on the 737.

VIDEO: How a 737 is built, again from Sprit AeroSystems.
And Spirit AeroSystems staff from around the world celebrated the delivery of the 10,000th 737 fuselage to Boeing.


The first flight of a Boeing 737 took place more than 50 years ago in 1967.
The 737 can be categorised into four eras.
First came the “Originals”, which include the -100 and -200 series.
Then followed the “Classics” covering the -300, -400 and -500 series, and the “Next Generation” or NGs that was launched in 1993 and features the -600, -700, -800, and -900.
Finally, Boeing launched the fourth generation of 737, called the “MAX”, in 2011. There are five major variants within the MAX, the 7, 8, 9, 10 and 200.
Launch customer Malindo Air operated the first commercial flight with a 737 MAX in 2017.

Malindo Air first Boeing 737 MAX 8, 9M-LRC. (Boeing)
Malindo Air first Boeing 737 MAX 8, 9M-LRC. (Boeing)
In this part of the world, Qantas and Virgin Australia are both big operators of the 737 with 75 and 82 in their fleets, respectively.
Virgin Australia recently took delivery of its last new-build 737-800. The airline is also a MAX customer, with 40 of the type on order and due to arrive from the end of 2019.
The 10,000th 737 was due to be delivered to Southwest Airlines.
The 10,000th 737 at Boeing's Renton final assembly line. (Boeing/Twitter)
The 10,000th 737 at Boeing’s Renton final assembly line. (Boeing/Twitter)
The 10,000th 737 at Boeing's Renton final assembly line. (Boeing/Twitter)
The 10,000th 737 at Boeing’s Renton final assembly line. (Boeing/Twitter)
close

Each day, our subscribers are more informed with the right information.

SIGN UP to the Australian Aviation magazine for high-quality news and features for just $99.95 per year