Features
A key milestone was achieved at the Boeing Everett factory in Washington in November when engineers completed assembly of the major fuselage sections of the first flight-test B777X, the manufacturer’s latest long-haul, twin-aisle jet.
Headlines
Boeing chief financial officer Greg Smith says the 777-9X is still on track to begin flight tests later in 2019 despite the need for some re-testing work on the GE9X engines powering the aircraft.
Airlines
We were joined on the Australian Aviation podcast by Ted Ingling, the program general manager for the GE9X, the engine that will power the Boeing 777-X.